PROJECTS
Tender No. : 136/2005
Contract Value : 4,4750,000.000 R.O
Client : Public Authority for Electricity &Water
Consultant : Energoprojekt Entel LLC
Main Contractor : Societe Egyptiene D’Entraprises ( Moukhtar Ibrahim ) – SEDE
Central Desalination plant at sur Water Suupply Scheme at Al Sharqyah Region
Our scope :
-
Main Forwarding pumps complete with electrical. Motors including hydraulic calculations like duty point NPSH calculation pump and motor selection etc..
-
Fire Fighting Pumps and related piping works
-
Domestic water pumps and related pipe works
-
Sump Pumps
-
Diesel generator and accessories ( day and bulk fuel tanks, AMF panel fuel transfer pumps and piping , battery and battery charger , exhaust piping system and Supports, etc…)
-
Water hammer protection vessels/system including Surge analysis study , for pressure vessels and pipeline, main vessels with cat ladder , pipe fitting ,valves, air compressors with air piping , level indicators, level switches, Safety valves control panel cables, etc…
-
Pump Houses Piping and valves up to end of wall pieces or 1 meter out of the building wall of each pump house including pipe fitting with gaskets, bolts , and any required jointing material and pipe supports.
-
Medium Voltage and Low voltage Switchgear MCC’s, Capacitors, 30 V.DC. Source battery charger and batteries including designing drawing electrical calculations colorations study protection study, with all necessary interfacing with SCADA
-
Power and Control Cables, Cable Trays, etc….
-
Elect. Bus duct and bus trucking system complete with elbows, flex Pieces.
-
Overhead Crane including all girders, steel runway beams Power Cables, Flex Cables and Control Panels.
-
Cat and Mouse Mechanical level indicators for all Ground Reservoir.
-
All pipe work of Tanker filling Stations include Prepaid card system vender machines
-
Put control philosophy for the project and prepare all hardware signals to SCADA calibrate and commissioning Motor Operated Valves with complete coordination supervision.
-
Commissioning, Testing, 90 Days Trail Operation and Maintenance works completion
-
Give advise design and recommendations to Main Contractor regarding air valve at pipeline (type, Quantity, and location) Orifice plate ( location, size, design, and detailed fabrications), Flow Control Valves.