Tender No. :          136/2005

Contract Value :    4,4750,000.000 R.O

Client :                    Public Authority for Electricity &Water

Consultant :           Energoprojekt Entel LLC

Main Contractor :  Societe Egyptiene D’Entraprises ( Moukhtar Ibrahim ) – SEDE

Central Desalination plant at sur Water Suupply Scheme at Al Sharqyah Region

Our scope :

 

  1. Main Forwarding pumps complete with electrical. Motors including hydraulic calculations like duty point NPSH calculation pump and motor selection etc..

  2. Fire Fighting Pumps and related piping works

  3. Domestic water pumps and related pipe works

  4. Sump Pumps

  5. Diesel generator and accessories ( day and bulk fuel tanks, AMF panel fuel transfer pumps and piping , battery and battery charger , exhaust piping system and Supports, etc…)

  6. Water hammer protection vessels/system including Surge analysis study , for pressure vessels and pipeline, main vessels with cat ladder , pipe fitting ,valves, air compressors with air piping , level indicators, level switches, Safety valves control panel cables, etc…

  7. Pump Houses Piping and valves up to end of wall pieces or 1 meter out of the building wall of each pump house including pipe fitting with gaskets, bolts , and any required jointing material and pipe supports.

  8. Medium Voltage and Low voltage Switchgear MCC’s, Capacitors, 30 V.DC. Source battery charger and batteries including designing drawing electrical calculations colorations study protection study, with all necessary interfacing with SCADA

  9. Power and Control Cables, Cable Trays, etc….

  10. Elect. Bus duct and bus trucking system complete with elbows, flex Pieces.

  11. Overhead Crane including all girders, steel runway beams Power Cables, Flex Cables and Control Panels.

  12. Cat and Mouse Mechanical level indicators for all Ground Reservoir.

  13. All pipe work of Tanker filling Stations include Prepaid card system vender machines

  14. Put control philosophy for the project and prepare all hardware signals to SCADA calibrate and commissioning Motor Operated Valves with complete coordination supervision.

  15. Commissioning, Testing, 90 Days Trail Operation and Maintenance works completion

  16. Give advise design and recommendations to Main Contractor regarding air valve at pipeline (type, Quantity, and location) Orifice plate ( location, size, design, and detailed fabrications), Flow Control Valves.